The project will provide ADIF High Speed with a state-of-the-art maintenance facility for locomotives, track recording trains and other auxiliary railway vehicles, increasing maintenance capacity and improving the efficiency of railway infrastructure operations
https://inserail.es/wp-content/uploads/2026/06/taller_Adif_Madrid_Sur_inserail.png9411672Jaime Cañedohttps://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.pngJaime Cañedo2026-06-28 19:49:002026-06-29 15:18:01Inse Rail’s Design for ADIF High Speed’s New Madrid Maintenance Depot Moves into the Construction Phase
The renewal of this section will enhance operating conditions, passenger comfort, and service reliability, while also optimizing the maintenance requirements of the railway infrastructure
https://inserail.es/wp-content/uploads/2026/06/infiesto-arriondas_inserail.jpeg450600Jaime Cañedohttps://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.pngJaime Cañedo2026-06-28 18:45:092026-06-28 18:45:09Inse Rail Awarded Technical Assistance Contract for ADIF on the Oviedo–Santander Railway Line
https://inserail.es/wp-content/uploads/2026/06/terminal-Fuente-San-Luis_inserail.png7171545Jaime Cañedohttps://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.pngJaime Cañedo2026-06-26 20:30:572026-06-28 20:34:00Inse Rail’s Design for the Valencia-Fuente de San Luis Intermodal Terminal Moves Closer to Operational Service
https://inserail.es/wp-content/uploads/2026/05/instalaciones-electricas_inserail.jpeg13332000Jaime Cañedohttps://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.pngJaime Cañedo2026-05-26 18:58:192026-05-26 18:58:19INSE RAIL awarded a technical assistance contract for electrification and remote control works on the metre-gauge railway network in Asturias.
Inse Rail’s Design for ADIF High Speed’s New Madrid Maintenance Depot Moves into the Construction Phase
The project will provide ADIF High Speed with a state-of-the-art maintenance facility for locomotives, track recording trains and other auxiliary railway vehicles, increasing maintenance capacity and improving the efficiency of railway infrastructure operations
Inse Rail Awarded Technical Assistance Contract for ADIF on the Oviedo–Santander Railway Line
The renewal of this section will enhance operating conditions, passenger comfort, and service reliability, while also optimizing the maintenance requirements of the railway infrastructure
Inse Rail’s Design for the Valencia-Fuente de San Luis Intermodal Terminal Moves Closer to Operational Service
The completion of this first phase represents an important step towards the full operation of the Valencia-Fuente de San Luis terminal
INSE RAIL awarded a technical assistance contract for electrification and remote control works on the metre-gauge railway network in Asturias.
The project is part of the investments aimed at modernising the energy and railway electrification facilities of the metre-gauge network in Asturias