Inserail
  • Facebook
  • Linkedin
  • Twitter
    • Es
    • Cat
  • Home
  • Company
  • Areas of Activity
  • Services
  • Projects
  • R&D&I
  • News
  • Contact
  • Menu
Construction Engineering

Inse Rail, awarded the contract to supervise of the works for the replacement telephone blocking on the Bobadilla-Ronda line

20 April, 2023

Adif is moving forward with the project to eliminate telephone blocking on the Bobadilla-Ronda section -70.5 km between the provinces of Málaga and Cádiz- of the Bobadilla-Algeciras line, which will be replaced with an advanced signaling and telecommunications system, an Automatic Single-Track Blocking (BAU), which will work with Centralized Traffic Control (CTC). 

The project, with an investment of 27.9 million euros, will improve the reliability of the facilities and the quality of the service. With this project, the system will be implemented along the full length of the railway line, because it is already installed between Ronda and Algeciras (105.5 km).

The works, which involve modifications to the signaling, energy and telecommunications facilities and the installation of new state-of-the-art electronic interlockings, will be supervised by the Inse Rail-Meta Engineering joint venture, with a completion time of 26 months.

The main actions to be carried out are the following:

  • Replacement of the electrical interlocking in Bobadilla and the Bouré interlockings in Campillos, Almargen/Cañete La Real and Setenil, with new electronic interlockings.
  • Installation of Automatic Single-Track Blocking (BAU) throughout the section.
  • Integration of new electronic interlockings in the CTCs in Ronda and Córdoba.
  • New technical buildings for signaling and telecommunications facilities in the Bobadilla, Campillos, Almargen/Cañete La Real and Setenil stations, as well as at the intermediate posts in Teba, Atalaya and Parchite.
  • In Bobadilla, Campillos and Almargen/Cañete La Real stations, traffic offices will also be built.

 

Source: Inse Rail


Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on Linkedin
  • Share by Mail
https://inserail.es/wp-content/uploads/2023/04/Bobadilla_Ronda_inserail_3.jpeg 675 1200 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2023-04-20 12:36:162023-04-29 12:38:45Inse Rail, awarded the contract to supervise of the works for the replacement telephone blocking on the Bobadilla-Ronda line

Categories

  • Uncategorized
  • Our Company
  • R&D&I
  • Consulting
  • Design
  • Construction Engineering
  • Operation and Maintenance
  • Project Management

Inse Rail

The company
R+D+I
Work with us

Catalá | Español

Activities

Railway Systems
Transport Infrastructure
Energy and Industrial Installations
Innovation

Offices

Madrid (Central)
Barcelona
Portugal
Saudi Arabia

Recent projects

Diagonal tram extension. (Barcelona)


https://inserail.es/wp-content/uploads/2023/10/tranvia_diagonal1_inserail.jpeg 900 1200 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2023-10-22 12:36:522023-10-22 21:08:05Diagonal tram extension. (Barcelona)

Services to coordinate the Metro de Málaga works for handover to the concessionaire and commissioning supervision


https://inserail.es/wp-content/uploads/2022/04/metro-malaga_inserail.png 420 728 Jaime Cañedo https://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.png Jaime Cañedo2022-10-17 12:11:082022-10-30 11:33:09Services to coordinate the Metro de Málaga works for handover to the concessionaire and commissioning supervision

© Copyright INSE RAIL S.L. | Avenida de Burgos, 12 – 7th Floor 28036 Madrid | T. +34 91 302 95 40

Disclaimer  |  Privacy Policy | Cookie Policy

Inse Rail, defending real equality New contract for the electrical infrastructure project of the Algeciras-Ronda...
Scroll to top