A study of alternatives will be carried out and the project that is developed will guarantee the safe pedestrian connection and accessibility of passengers to the station
https://inserail.es/wp-content/uploads/2023/12/Antiguo-apeadero-de-Renfe-en-Almodóvar-del-Río_-inserail.jpg6751200Jaime Cañedohttps://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.pngJaime Cañedo2023-12-28 10:34:312023-12-31 10:37:02Inse Rail to prepare the project for the adaptation and return to service of the old Almodóvar del Río Station in Córdoba
The project also includes the electrification of tracks 8 and 9 in the station, as well as the actions required in the installations of the substations and Intermediate Transformation Centers
https://inserail.es/wp-content/uploads/2023/11/electrificacion_antequera_inserail.jpg436828Jaime Cañedohttps://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.pngJaime Cañedo2023-11-29 18:03:132023-12-11 18:15:33Inse Rail to draft the electrification project for the doubling of the Antequera – Granada high-speed line between Archidona and La Chana (Granada)
TMB’s plans to expand its fleet of trains will also require the upgrading and expansion of the workshop areas for the maintenance and infrastructure of trains, equipment and components
https://inserail.es/wp-content/uploads/2023/11/vilapicina_inserail.jpg400600Jaime Cañedohttps://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.pngJaime Cañedo2023-11-25 17:07:202023-12-11 18:15:44TMB awards Inse Rail the contract to draft the project for the upgrading of the Vilapicina workshop
https://inserail.es/wp-content/uploads/2023/10/5569109273_532ec5b61c_b.jpg6811023Jaime Cañedohttps://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.pngJaime Cañedo2023-11-02 17:58:262023-11-02 17:58:26Inse Rail is awarded the contract for the control and monitoring of the works to extend the Salteras siding to 750 meters
Inse Rail to prepare the project for the adaptation and return to service of the old Almodóvar del Río Station in Córdoba
A study of alternatives will be carried out and the project that is developed will guarantee the safe pedestrian connection and accessibility of passengers to the station
Inse Rail to draft the electrification project for the doubling of the Antequera – Granada high-speed line between Archidona and La Chana (Granada)
The project also includes the electrification of tracks 8 and 9 in the station, as well as the actions required in the installations of the substations and Intermediate Transformation Centers
TMB awards Inse Rail the contract to draft the project for the upgrading of the Vilapicina workshop
TMB’s plans to expand its fleet of trains will also require the upgrading and expansion of the workshop areas for the maintenance and infrastructure of trains, equipment and components
Inse Rail is awarded the contract for the control and monitoring of the works to extend the Salteras siding to 750 meters
The contract includes actions on infrastructure, track, electrification, signalling and communications