The construction project for the remodel was designed by Inse Rail to expand the functionality and operation of the station’s layout to improve traffic performance and improve operating efficiency
https://inserail.es/wp-content/uploads/2024/10/240530_np_prtr_adj_remodelacion_estacion_grisen_zaragoza.jpg8631150Jaime Cañedohttps://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.pngJaime Cañedo2024-10-31 18:33:502024-10-31 18:33:50Inse Rail to supervise the comprehensive remodeling works of the Grisén railway station
It aims to address the existing technological challenges posed by railway clearances, as well as the new challenges that will generated by the new scenario of deregulation, promotion and development of European passenger and freight railway traffic
Between the Estadio Metropolitano and Pitis stations, to provide the line with a high-performance, high-availability Target Distance signaling system that will make it possible to remove obsolescent equipment
https://inserail.es/wp-content/uploads/2024/09/linea7_renovacion_señalizacion_inserail.jpeg6581170Jaime Cañedohttps://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.pngJaime Cañedo2024-09-10 13:46:122024-09-12 13:47:39Metro de Madrid awards Inse Rail supervision of the works to renovate signaling on Line 7A
https://inserail.es/wp-content/uploads/2024/06/estacion_pasante_atocha_inserail.jpg7771160Jaime Cañedohttps://inserail.es/wp-content/uploads/2019/08/LOGO_INSERAIL.pngJaime Cañedo2024-07-03 18:09:452024-07-03 18:13:46Inse Rail, awarded the contract to supervise the works of the Atocha transit station, in consortium with three other engineering firms
Inse Rail to supervise the comprehensive remodeling works of the Grisén railway station
The construction project for the remodel was designed by Inse Rail to expand the functionality and operation of the station’s layout to improve traffic performance and improve operating efficiency
Inse Rail completes the GALIBRAIL innovation project for railway clearances
It aims to address the existing technological challenges posed by railway clearances, as well as the new challenges that will generated by the new scenario of deregulation, promotion and development of European passenger and freight railway traffic
Metro de Madrid awards Inse Rail supervision of the works to renovate signaling on Line 7A
Between the Estadio Metropolitano and Pitis stations, to provide the line with a high-performance, high-availability Target Distance signaling system that will make it possible to remove obsolescent equipment
Inse Rail, awarded the contract to supervise the works of the Atocha transit station, in consortium with three other engineering firms
Transforming Atocha station: an underground station will connect the high speed line with Chamartín