INSERAIL has been awarded the contract to provide the SERVICE FOR THE SAFETY STUDY AND TECHNICAL ASSISTANCE FOR THE EXTENSION OF THE TARGET DISTANCE SIGNALING SYSTEM ON THE SAN LORENZO – BILBAO SECTION OF LINE 4 OF METRO DE MADRID (LOT 2- CONTRACT TENDER 6011900009), with a contract duration of 18 months.
This work forms part of the planning by Metro de Madrid to overhaul the signaling system of line 4, between the Bilbao and San Lorenzo stations, in order to extend the existing signaling system between those stations to the rest of the line, equipping it with technology that will improve the performance of the line in the areas of operation, maintenance and safety.
This work will completely renovate the system between the Bilbao and San Lorenzo stations, consisting of the homogenization of the interlockings, because most of the line is currently equipped with electromechanical interlockings, track circuits, wiring, switch motors, signals, balises, onboard equipment and the other elements that make up the signaling system.