Construction Engineering
Consulting and assistance to monitor the monitoring works execution on the Murcia-Almería High-Speed Mediterranean Corridor construction project. Section: Nonduermas-Sangonera
ADIF
Country: Spain
Year: 2021- 2023
The main purpose of the works is to create a railway platform that will allow trains to run at speeds of up to 300 km/h
Inse Rail, in a joint venture with the companies Curva Ingenieros and Geocisa, is executing this assistance and consulting contract for the execution of the works for the Murcia-Almería high-speed Mediterranean Corridor construction project. Section: Nonduermas-Sangonera, as well as the drafting of the modified, complementary, and settlement projects that will be generated over the course of the project.
The main purpose of the works is to construct a double-track railway platform in the Nonduermas-Sangonera section of the Murcia-Almería High Speed Line, with characteristics that will allow trains to travel at speeds of up to 300 km/h in the future.
The main actions included in the construction project of a platform for high-speed dual track are: track installation Chinchilla-Cartagena to the Murcia Cargas logistics center; modification of interlockings to control the Murcia Cargas-Alcantarilla bypass section; construction of the new commuter rail station in Alcantarilla; remodeling of 3 tracks in the Murcia Cargas Logistics Complex track yard; construction of 2 cut-and-cover tunnels, 5 overpasses over the platform, 3 tunnel overpasses, as well as 3 underpasses; and other elements to promote urban permeability such as pedestrian walkways.
Diagonal tram extension. (Barcelona)
Services to coordinate the Metro de Málaga works for handover to the concessionaire and commissioning supervision