{"id":7144,"date":"2024-05-28T10:00:34","date_gmt":"2024-05-28T08:00:34","guid":{"rendered":"https:\/\/inserail.es\/?p=7144"},"modified":"2024-05-31T10:39:46","modified_gmt":"2024-05-31T08:39:46","slug":"inse-rail-awarded-the-contract-to-supervise-the-control-command-and-signaling-works-of-the-high-speed-access-channel-to-valencia","status":"publish","type":"post","link":"https:\/\/inserail.es\/en\/inse-rail-awarded-the-contract-to-supervise-the-control-command-and-signaling-works-of-the-high-speed-access-channel-to-valencia\/","title":{"rendered":"Inse Rail awarded the contract to supervise the control, command and signaling works of the high-speed access channel to Valencia"},"content":{"rendered":"\r\n<p><span lang=\"EN-US\">The works will adapt these facilities to the new road configuration associated with the Access Channel.<\/span><\/p>\r\n<p><span lang=\"EN-US\">This contract includes the adaptation of the management system for the Valencia-Joaqu\u00edn Sorolla traffic and the Regulation and Control Center for the high-speed line, among other facilities; as well as the procedure for trains to enter and exit on the connection between Joaqu\u00edn Sorolla and Valencia-Nord. <\/span><\/p>\r\n<p><span lang=\"EN-US\">New signaling and other field elements of the safety and communications equipment will also be installed, including track circuits, axle counters, balises and fallen-object detectors, in addition to technical verifications and testing.<\/span><\/p>\r\n<p><span lang=\"EN-US\">The Valencia Access Channel project and the remodeling of the Valencia-Joaqu\u00edn Sorolla station are key operations to integrate the railway into Valencia. <\/span><\/p>\r\n<p><span lang=\"EN-US\">The tunneling of the access roads to the two stations in Valencia will free up land for city development. The Joaqu\u00edn Sorolla station will also be transformed &#8211; including the expansion of its parking &#8211; to handle the increased demand as a result of the from the deregulation of rail services and the development of the Mediterranean Corridor.\u00a0<\/span><\/p>\r\n<p class=\"mce\"><em>Source: Inse Rail<\/em><\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>The works will adapt these facilities to the new road configuration associated with the Access Channel.<\/p>\n","protected":false},"author":4,"featured_media":7147,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[88],"tags":[],"class_list":["post-7144","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-construction-engineering","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts\/7144","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/comments?post=7144"}],"version-history":[{"count":4,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts\/7144\/revisions"}],"predecessor-version":[{"id":7174,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts\/7144\/revisions\/7174"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/media\/7147"}],"wp:attachment":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/media?parent=7144"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/categories?post=7144"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/tags?post=7144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}