{"id":7069,"date":"2024-02-29T23:09:13","date_gmt":"2024-02-29T22:09:13","guid":{"rendered":"https:\/\/inserail.es\/?p=7069"},"modified":"2024-02-29T23:09:13","modified_gmt":"2024-02-29T22:09:13","slug":"inse-rail-to-supervise-the-adaptation-works-of-the-facilities-at-the-montcada-bifurcacion-montcada-bifurcacion-aigues-and-montcada-i-reixac-stations","status":"publish","type":"post","link":"https:\/\/inserail.es\/en\/inse-rail-to-supervise-the-adaptation-works-of-the-facilities-at-the-montcada-bifurcacion-montcada-bifurcacion-aigues-and-montcada-i-reixac-stations\/","title":{"rendered":"Inse Rail to supervise the adaptation works of the facilities at the Montcada Bifurcaci\u00f3n, Montcada Bifurcaci\u00f3n Aig\u00fces and Montcada i Reixac stations"},"content":{"rendered":"\r\n<p style=\"font-weight: 400;\">Inse Rail, in a joint venture with the companies GPO and Airtren, has been awarded the ADIF contract to supervise the works on the installations of the ERTMS train protection systems and fixed telecommunications, GSM-R mobile telecommunications, ground train and control and signaling control safety installations in the provisional phase, in the Montcada Bifurcaci\u00f3n, Montcada Bifurcaci\u00f3n Aigu\u0308es\u00a0 and Montcada i Reixac stations (including adjacent stations and their routes) to adapt them to the new track configuration, in accordance with the remodeling and tunneling works that will be carried out with the execution of the infrastructure and catenary construction projects.<\/p>\r\n<p style=\"font-weight: 400;\">The actions are divided into three main projects:<\/p>\r\n<ul>\r\n<li>Construction project Safety Installations impact of the remodeling of Montcada Bifurcaci\u00f3n.<\/li>\r\n<li>Construction project for the execution of the Control, Command and Signaling provisional phases in Bifurcaci\u00f3n Aig\u00fces.<\/li>\r\n<li>Construction project for the execution of the Control, Command and Signaling provisional phases of the Montcada i Reixac tuneling.<\/li>\r\n<\/ul>\r\n<p class=\"mce\"><em>Source: Inse Rail<\/em><\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>Installations of the ERTMS train protection systems and fixed telecommunications, GSM-R mobile telecommunications, ground train and control and signaling control safety installations in the provisional phase<\/p>\n","protected":false},"author":4,"featured_media":7072,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[88],"tags":[],"class_list":["post-7069","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-construction-engineering","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts\/7069","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/comments?post=7069"}],"version-history":[{"count":2,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts\/7069\/revisions"}],"predecessor-version":[{"id":7078,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts\/7069\/revisions\/7078"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/media\/7072"}],"wp:attachment":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/media?parent=7069"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/categories?post=7069"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/tags?post=7069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}