{"id":6680,"date":"2023-03-28T08:54:48","date_gmt":"2023-03-28T06:54:48","guid":{"rendered":"https:\/\/inserail.es\/?p=6680"},"modified":"2023-04-04T09:01:43","modified_gmt":"2023-04-04T07:01:43","slug":"inse-rail-participates-in-the-opening-of-the-extension-of-the-malaga-metro-to-the-historic-city-center","status":"publish","type":"post","link":"https:\/\/inserail.es\/en\/inse-rail-participates-in-the-opening-of-the-extension-of-the-malaga-metro-to-the-historic-city-center\/","title":{"rendered":"Inse Rail participates in the opening of the extension of the Malaga metro to the historic city center"},"content":{"rendered":"\r\n<p style=\"font-weight: 400;\">On Tuesday, March 27, 2023, a large delegation headed by the president of the Regional Government, Juanma Moreno; the Councilor of Development, Marifr\u00e1n Carazo and the mayor of M\u00e1laga, Francisco de la Torre, among others, officially opened the route between the stations of Alameda Principal (Atarazanas) and El Corte Ingl\u00e9s (Guadalmedina), kicking off commercial operation of the metro in the center of M\u00e1laga.<\/p>\r\n<p><span style=\"font-weight: 400;\">In addition to political representatives, the event was also attended by citizens, merchants and residents in the area, representatives of the concessionaire company, Metro de M\u00e1laga and the companies that participated in the project, including Inse Rail<\/span>.<\/p>\r\n<blockquote class=\"wp-block-quote\">\r\n<p><span lang=\"EN-GB\">Inse Rail&#8217;s President, Cesar Ca\u00f1edo-Arg\u00fcelles and the Director of the Industrial Division, Oscar Domingo, who oversaw the contract executed by Inse Rail for the Regional Government of Andalusia since March 2022, in consortium with the company Betancourt, were in attendance to represent the company. The purpose of the consortium was to coordinate the most recent works and facilities of the M\u00e1laga Metro and to supervise the commissioning before handover to the concessionaire<\/span>.<\/p>\r\n<\/blockquote>\r\n<p><span lang=\"EN-GB\">The new extension section of the M\u00e1laga Metro to the historic city center is one kilometer long, although, since both lines merge between El Perchel and Guadalmedina, the actual infrastructure built is 1.7 kilometers long, with two new underground stations: Guagalmedina and Atarazanas. With this new route, user demand is expected to double from approximately 7 million\u00a0 to 14 million passengers per year, and continue to offer improvements that strengthen this comfortable, safe and environmentally friendly means of metropolitan transport<\/span>.<\/p>\r\n<div>\u00a0<\/div>\r\n<div><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-6693\" src=\"https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_3-138x300.jpg\" alt=\"\" width=\"138\" height=\"300\" srcset=\"https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_3-138x300.jpg 138w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_3-475x1030.jpg 475w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_3-708x1536.jpg 708w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_3-692x1500.jpg 692w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_3-325x705.jpg 325w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_3-450x976.jpg 450w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_3.jpg 738w\" sizes=\"auto, (max-width: 138px) 100vw, 138px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-6683\" src=\"https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533149_180112306_1024x683-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533149_180112306_1024x683-300x200.jpg 300w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533149_180112306_1024x683-768x512.jpg 768w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533149_180112306_1024x683-705x470.jpg 705w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533149_180112306_1024x683-450x300.jpg 450w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533149_180112306_1024x683.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>\u00a0<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-6696\" src=\"https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_2-300x138.jpg\" alt=\"\" width=\"300\" height=\"138\" srcset=\"https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_2-300x138.jpg 300w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_2-1030x475.jpg 1030w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_2-768x354.jpg 768w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_2-1536x708.jpg 1536w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_2-1500x692.jpg 1500w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_2-705x325.jpg 705w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_2-450x208.jpg 450w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_2.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/div>\r\n<div>\u00a0<\/div>\r\n<div><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-6699\" src=\"https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_1-300x138.jpg\" alt=\"\" width=\"300\" height=\"138\" srcset=\"https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_1-300x138.jpg 300w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_1-1030x475.jpg 1030w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_1-768x354.jpg 768w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_1-1536x708.jpg 1536w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_1-1500x692.jpg 1500w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_1-705x325.jpg 705w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_1-450x208.jpg 450w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/foto_inauguracion_metro_malaga_inserail_1.jpg 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/div>\r\n<div>\u00a0<\/div>\r\n<div><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-6707\" src=\"https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533163_180112980_1024x690-300x202.jpg\" alt=\"\" width=\"300\" height=\"202\" srcset=\"https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533163_180112980_1024x690-300x202.jpg 300w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533163_180112980_1024x690-768x518.jpg 768w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533163_180112980_1024x690-705x475.jpg 705w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533163_180112980_1024x690-450x303.jpg 450w, https:\/\/inserail.es\/wp-content\/uploads\/2023\/03\/fotos-inauguracion-Metro-centro-Malaga_1778533163_180112980_1024x690.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/div>\r\n<p style=\"font-weight: 400;\"><em>Source: Inse Rail<\/em><i><\/i><\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>Inse Rail&#8217;s President, Cesar Ca\u00f1edo-Arg\u00fcelles and the Director of the Industrial Division, Oscar Domingo, were in attendance to represent the company<\/p>\n","protected":false},"author":4,"featured_media":6688,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[88,39],"tags":[],"class_list":["post-6680","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-construction-engineering","category-our-company","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts\/6680","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/comments?post=6680"}],"version-history":[{"count":2,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts\/6680\/revisions"}],"predecessor-version":[{"id":6716,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/posts\/6680\/revisions\/6716"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/media\/6688"}],"wp:attachment":[{"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/media?parent=6680"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/categories?post=6680"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/inserail.es\/en\/wp-json\/wp\/v2\/tags?post=6680"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}