{"id":6968,"date":"2023-11-02T17:55:19","date_gmt":"2023-11-02T16:55:19","guid":{"rendered":"https:\/\/inserail.es\/?p=6968"},"modified":"2023-11-02T17:55:19","modified_gmt":"2023-11-02T16:55:19","slug":"inse-rail-adjudicataria-del-control-i-vigilancia-de-les-obres-dampliacio-de-la-longitud-util-de-via-a-750-m-de-lapartador-de-salteras","status":"publish","type":"post","link":"https:\/\/inserail.es\/ca\/inse-rail-adjudicataria-del-control-i-vigilancia-de-les-obres-dampliacio-de-la-longitud-util-de-via-a-750-m-de-lapartador-de-salteras\/","title":{"rendered":"Inse Rail, adjudicat\u00e0ria del control i vigil\u00e0ncia de les obres d\u2019ampliaci\u00f3 de la longitud \u00fatil de via a 750 m de l\u2019apartador de Salteras"},"content":{"rendered":"\r\n<p style=\"font-weight: 400;\">ADIF ha adjudicat a INSE RAIL, en UTE, l\u2019assist\u00e8ncia t\u00e8cnica per al control i vigil\u00e0ncia de les obres d\u2019ampliaci\u00f3 de la longitud \u00fatil de via a 750 m de l\u2019apartador de Salteras (Sevilla), que inclou actuacions en infraestructura, via, electrificaci\u00f3, senyalitzaci\u00f3 i comunicacions.<\/p>\r\n<p style=\"font-weight: 400;\">Dins de les actuacions de millora de la l\u00ednia Sevilla-Huelva, es considera priorit\u00e0ria l\u2019adequaci\u00f3 de l\u2019actual estaci\u00f3 de Salteras per a l\u2019apartat de trens de 750 m, mitjan\u00e7ant la prolongaci\u00f3 de la longitud \u00fatil de les vies d\u2019estacionament i apartat.<\/p>\r\n<p style=\"font-weight: 400;\"><span lang=\"CA\">Aquesta estaci\u00f3 pertany a la Xarxa de Rodalies de Sevilla, dintre de la l\u00ednia C-5 al PK 12\/881. <\/span><\/p>\r\n<p style=\"font-weight: 400;\">Es prolongar\u00e0 la via 2 d\u2019apartat per totes dues cap\u00e7aleres, mitjan\u00e7ant l\u2019execuci\u00f3 de la corresponent plataforma i superestructura de via, a m\u00e9s de l\u2019electrificaci\u00f3 i senyalitzaci\u00f3 necess\u00e0ries. Aquesta ampliaci\u00f3 comportar\u00e0 l\u2019execuci\u00f3 de diversos murs i l\u2019ampliaci\u00f3 de l\u2019ODT afectada. Totes dues connexions de via 2 amb via 1 estaran dotades de via de seguretat.<\/p>\r\n<div class=\"post-meta-author\"><span class=\"post-author\"><span class=\"post-author\"><i>Font: Inse Rail<\/i><\/span><\/span><\/div>\r\n","protected":false},"excerpt":{"rendered":"<p>El contracte inclou actuacions en infraestructura, via, electrificaci\u00f3, senyalitzaci\u00f3 i comunicacions<\/p>\n","protected":false},"author":4,"featured_media":6976,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[91],"tags":[],"class_list":["post-6968","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-enginyeria-de-construccio","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/inserail.es\/ca\/wp-json\/wp\/v2\/posts\/6968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inserail.es\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/inserail.es\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/inserail.es\/ca\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/inserail.es\/ca\/wp-json\/wp\/v2\/comments?post=6968"}],"version-history":[{"count":2,"href":"https:\/\/inserail.es\/ca\/wp-json\/wp\/v2\/posts\/6968\/revisions"}],"predecessor-version":[{"id":6980,"href":"https:\/\/inserail.es\/ca\/wp-json\/wp\/v2\/posts\/6968\/revisions\/6980"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inserail.es\/ca\/wp-json\/wp\/v2\/media\/6976"}],"wp:attachment":[{"href":"https:\/\/inserail.es\/ca\/wp-json\/wp\/v2\/media?parent=6968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/inserail.es\/ca\/wp-json\/wp\/v2\/categories?post=6968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/inserail.es\/ca\/wp-json\/wp\/v2\/tags?post=6968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}